Galway Property Facts

18343: 105 Salthill Upper, Galway city

Permission for development which will consist of (1) Demolition of the existing house (2) Redevelopment of the proposed site to accommodate an infill apartment complex - The proposed development will include 39 no. apartments, together with associated balconies. The proposed development is arranged in 2 no. blocks, resulting in a 3 -4 storey building over basement, fronting onto Salthill Road Upper (Block B) and a 6-8 storey building over basement fronting onto Toft Park (Block A), - Block B will consist of 11 no. 1 - bed apartments a 1 no. 3- bed apartment with a winter garden/balcony at penthouse level, together with a concierge room and a ESB/Switch Room to be provided at ground level. - Block A will consist of 26 no. 2-bed apartments a 1 no. 3-bed apartment together with a Community room with a roof garden & patio at Penthouse level and a Solar PV panel Array at Roof level. Revised vehicular access and building signage onto the Salthill Road Upper (R864). Car parking spaces, refuse compound and storage for apartments to be provided at basement level. Site landscaping including the provision of courtyard garden area, with art sculpture and play area at surface/ground level. Revised boundary treatments and revised access arrangements for pedestrians, wheelchairs and cyclists and associated bicycle parking. Provision of ancillary works including a rainwater harvesting system and connection to existing foul sewer network & public mains, together with all other site works and services

Status
Conditional
Lodged
31 Oct 2018
Decided
20 Jun 2019
Type
Permission
Council
Galway City Council
Council record
eplanning.ie/GalwayCity/AppFileRefDetails/18343/0
Town
Galway City
Street
Sold prices on Salthill Upper

View location on OpenStreetMap

Recent applications in Galway City

Source: National Planning Application Database (NPAD), Department of Housing, Local Government and Heritage (CC BY 4.0); look the application up on the council's ePlanning register for documents and the current status. A lodged application is not an approval; an approval is not proof of completed works. Applicant names are not published.